PROJECT MANAGEMENT PRACTICES AND PERFORMANCE OF URBAN ROADS INFRASTRUCTURE IN NAIROBI CITY COUNTY, KENYA
Abstract
Purpose: The study examined the effect of project management practices on the performance of urban road infrastructure projects in Nairobi City County, Kenya, specifically focusing on project planning, project monitoring, stakeholder management, and risk management.
Statement of the Problem: Despite heavy investment by KURA in Nairobi City County, over 68% of road projects exceed contract sums, 62% record time overruns, and poor supervision reduces expected road lifespan by up to 40%. These persistent challenges, despite adoption of project management practices, signal critical gaps in their effective application and underscore the need for empirical investigation.
Methodology: The study adopted a descriptive research design targeting 183 respondents, 97 project managers, 32 resident engineers, and 54 KURA officials, from which 124 were selected through stratified random sampling. Semi-structured questionnaires generated both qualitative and quantitative data, analyzed using thematic analysis and SPSS version 28 respectively, through descriptive statistics, Pearson correlation, and multiple linear regression.
Findings: Project planning (β = 0.270, p = 0.023), project monitoring (β = 0.263, p = 0.000), stakeholder management (β = 0.241, p = 0.000), and risk management (β = 0.157, p = 0.011) all had positive and significant effects on project performance. Collectively, the four practices explained 67.7% of variance in performance (R² = 0.677, F = 99.161, p < 0.001).
Conclusions: Project management practices positively and significantly influence urban road infrastructure performance, and strengthening these practices leads to measurable improvements in project timelines, budget adherence, and quality outcomes.
Recommendations: Project managers should develop communication plans at project inception, adopt structured monitoring frameworks with real-time tracking tools, ensure systematic stakeholder identification and engagement, and embed proactive risk mitigation measures into all project execution plans.
Keywords: Project Management Practices, Performance, Urban Roads Infrastructure, Nairobi City County, Kenya
References
Adeyemo, D. I., Okolie, K. C., Ezeokoli, F. O., & Fadumo, O. D. (2023). Assessment of the Impact of Construction Project Planning on Project Performance in Ondo State, Nigeria. Tropical Built Environment Journal, 9(2).
Agyepong, L. O. (2023). Evaluation of Project Management Practices on Effective Implementation of Road Projects in the Western North Region of Ghana: A Case Study of the Benchema Junction-Adjoafua Road Project . Retrieved from https://ir.ucc.edu.gh.
Ahmed, H. A. (2024). Project Management Practices and Project Success of Afgoi Road Construction in Mogadishu Somalia. Retrieved from https://ir.kiu.ac.ug
Alayande, A. (2021). Analysis of Stakeholder Management in Public Construction Project Delivery in Abuja, Nigeria. Retrieved from http://irepo.futminna.edu.ng.
Algremazy, N. A., Ideris, Z., Alferjany, M. A., & Akram, A. (2023). The effect of risk management practices on project performance: A case study of the Libyan construction industry. International Journal of Professional Business Review: Int. J. Prof. Bus. Rev., 8(6), 5.
Amoah, C., & Pretorius, L. (2020). Evaluation of the impact of risk management on project performance in small construction firms in South Africa: the case study of construction systems. Journal of Engineering, Design and Technology, 18(3), 611-634.
Auditor-General (2023). Annual report on county and national government projects. Nairobi: Office of the Auditor-General.
Barney, J. B., & Harrison, J. S. (2020). Stakeholder theory at the crossroads. Business & Society, 59(2), 203-212.
Bergman, E. M., & Feser, E. J. (2020). Industrial and regional clusters: concepts and comparative applications.
Bryman, A. (2022). Social research methods (5th ed.). Oxford University Press.
Claeys, A. S., & Coombs, W. T. (2020). Organizational crisis communication:
Suboptimal crisis response selection decisions and behavioral economics. Communication Theory, 30(3), 290-309.
Devi, P. S. (2019). Research methodology: A handbook for beginners. New Delhi: Notion Press.
Freeman, R. E. (1984). Strategic Management: A Stakeholder Approach. New York: Pitman Publishing.
Gasana, E., & Njenga, G. (2024). Effects of Project Planning Practices for Project Performance: A Case of Sustainable Agricultural Intensification and Food Security Project in Rwanda. Journal of Entrepreneurship & Project Management, 8(1), 124-154.
Gichimu, E. M., & Mutuku, M. (2022). Stakeholder management and performance of county government funded projects in Nyeri County, Kenya. The Strategic Journal of Business & Change Management, 9(4), 761-774.
Goldratt, E. M. (1984). The Goal: A Process of Ongoing Improvement. London: North River Press.
Gor, M. O., & Mungai, A. M. W. (2024). Monitoring Practices And Performance Of Projects By Non-Governmental Organizations In Nairobi City County, Kenya. International Journal of Social Sciences Management and Entrepreneurship (IJSSME), 8(1).
Hair, J.O., Page, M. & Brunsveld, N. (2020). Essentials of Business Research Methods. London: Routledge
Hall, R. (2020). Qualitative, Quantitative and Combined Methods: Mixing Methods in Social Research. New York: SAGE Publications Ltd.
Iribagiza, A., & Kirabo, J. (2024). Influence of Project Management Practices on Performance of Projects in Rwanda. International Journal of Entrepreneurship and Project Management, 9(4), 36-54.
Juma, I. A., & Kamaara, M. (2024). Project Risk Management Practices and Performance of Affordable Housing Projects in Nairobi City County, Kenya. International Journal of Social Sciences Management and Entrepreneurship (IJSSME), 8(1).
Kahneman, D., & Tversky, A. (1979). Prospect Theory: An Analysis of Decision under Risk. Econometrica, 47(2), 263-292.
Kallow, M. A., Bodla, A. A., Ejaz, A., & Ishaq, M. R. (2023). How do risk management practices lead to project success in the construction industry? The mediated moderation of risk coping capacity and risk transparency. International Journal of Construction Management, 23(16), 2779-2787.
Kamau, F. W., & Paul, S. N. (2019). Effect of Project Management Practices on Performance of Construction Projects in Laikipia County, Kenya. International Journal of Recent Research in Social Sciences and Humanities, 5(2), 7-13.
Kamau, J. W., Ngugi, P. K., & Mchelule, Y. (2023). Financial project planning and performance of floricultural projects in Kenya. International Academic Journal of Economics and Finance, 4(1), 37-47.
KeNHA (2024). Annual roads performance report. Nairobi: Kenya National Highways Authority.
Kenya Roads Board. (2019). Annual Performance Report on Road Projects under Implementation by KeNHA. Nairobi: Kenya Roads Board.
Kenya Urban Roads Authority (KURA). (2018). Project Progress Report December 2018. Nairobi: KURA.
Kenya Urban Roads Authority. (2023). Annual report on completed road construction projects (2021-2024). Kenya Urban Roads Authority.
Kingori, P., Kamau, P. N., & Ouna, T. O. (2021). Assessing the Influence of Rainfall and Temperature on Adoption of Organic Farming in Laikipia West Sub County, Kenya. Journal of Arts and Humanities, 10(04), 49-63.
Kiptoo, I. K., Kariuki, S. N., & Ocharo, K. N. (2021). Risk management and financial performance of insurance firms in Kenya. Cogent Business & Management, 8(1), 1997246.
Kisavi, M. (2019). Factors Affecting Performance of Road Construction Projects in Kenya. Nairobi: University of Nairobi.
KNBS (2022). Economic survey 2022. Nairobi: Kenya National Bureau of Statistics.
Kyalo, A. M., & Kising’u, T. M. (2024). Project planning practices and performance of road construction projects in Kwale County, Kenya. The Strategic Journal of Business & Change Management, 11 (1), 823 – 845.
Latwal, G.S. (2020). Research Methodology. Florida: CRC Press.
Magagan, K. C., Ngugi, L. (2021). Influence of project management practices on performance of projects in Unilever Kenya Ltd. International Academic Journal of Information Sciences and Project Management, 3(6), 392-.418.
Majak, S. K., & Rotich, E. (2025). Project Design and Implementation of Road Construction Projects in Nairobi City County, Kenya. International Journal of Management and Business Research, 7(1), 17-31.
Mavuti, B. M., Kisingu, T. M. & Oyoo, J. J. (2019). Effect of project management practices on implementation of Kenya Ports Authority Funded projects. The Strategic Journal of Business & Change Management, 6 (2), 1110 – 1129.
Mbugua, M., & Winja, M. M. O. (2021). Identification and Ranking of Key Performance Indicators in Building Construction Projects in Kenya. Engineering, Technology & Applied Science Research, 11(1), 6668-6673.
McCleskey, J. A. (2020). Forty years and still evolving: The theory of constraints. American Journal of Management, 20(3).
Meyer, M. L., Louder, C. N., & Nicolas, G. (2022). Creating with, not for people: theory of change and logic models for culturally responsive community-based intervention. American Journal of Evaluation, 43(3), 378-393.
Mongina, C., & Moronge, M. (2021). Project management practices and performance of road construction projects in Nairobi City County, Kenya. The Strategic Journal of Business & Change Management, 8(1), 545-562.
Mtaki, L. D. (2024). Impact of Project Monitoring on Effective Project Implementation in Ludewa District Council. Retrieved from https://repository.out.ac.tz.
Mubasher, A., Aslam, S., & Saeed, K. (2024). Exploring the Influence of Project Management Practices on Project Success with the Moderating Role of Infrastructural Sustainability. Pakistan Journal of Social Sciences (PJSS), 44(3).
Mutua, M. M., Juma, J., & Owuor, D. (2020). Effects of project monitoring practices on implementation of road construction projects: a case study of Kilifi County. The Strategic Journal of Business & Change Management, 7(1), 664-685.
Mwita, C. (2020). The Rising Costs in Major Road Projects: A Case Study of Thika Superhighway. Kenya Institute for Public Policy Research and Analysis (KIPPRA).
Nzainga, I. K. (2023). Effects of Project Risk Management on the Performance of Geothermal Projects at Kengen Company PLC. Retrieved from https://erepository.uonbi.ac.ke.
Okafor, A. E. (2021). Influence of monitoring and evaluation system on the performance of projects. IJRDO-Journal of Social Science and Humanities Research, 6(8), 34-49.
Prietzel, T. T. (2020). The effect of emotion on risky decision making in the context of prospect theory: a comprehensive literature review. Management Review Quarterly, 70(3), 313-353.
Reinholz, D. L., & Andrews, T. C. (2020). Change theory and theory of change: what’s the difference anyway?. International Journal of STEM Education, 7, 1-12.
Ruggeri, K. & Folke, T. (2020). Replicating patterns of prospect theory for decision under risk. Nature human behaviour, 4(6), 622-633.
Srinivasan, N. P., & Dhivya, S. (2020). An empirical study on stakeholder management in construction projects. Materials Today: Proceedings, 21, 60-62.
Thielmann, I., Spadaro, G., & Balliet, D. (2020). Personality and prosocial behavior: A theoretical framework and meta-analysis. Psychological bulletin, 146(1), 30.
Tsofa, B., Waweru, E., Munywoki, J., Soe, K., Rodriguez, D. C., & Koon, A. D. (2023). Political economy analysis of sub-national health sector planning and budgeting: A case study of three counties in Kenya. PLoS Global Public Health, 3(1), e0001401.
Umulisa, C., & de Dieu Dushimimana, J. (2023). Effect of Project Planning Practices on Performance of Improve Capacity for Supply of Quality in Reproductive Health Services Project in Nyamasheke District, Rwanda. Journal of Entrepreneurship & Project Management, 7(15), 163-172.
Unegbu, H. C. & Yawas, D. S. (2022). An investigation of the relationship between project performance measures and project management practices of construction projects for the construction industry in Nigeria. Journal of King Saud University-Engineering Sciences, 34(4), 240-249.
Vrečko, I., Tominc, P., & Širec, K. (2023). Enhancing the performance of high-growth small-and medium-sized enterprises through effective project-management processes and stakeholder engagement: a systems perspective. Systems, 11(10), 511.
Wang, Z., Cai, Q., & Wei, G. (2023). Modified TODIM method based on cumulative prospect theory with Type-2 neutrosophic number for green supplier selection. Engineering Applications of Artificial Intelligence, 126, 106843.
Waweru, S. W., & Kimathi, D. (2022). Project monitoring and evaluation practices on performance of national government water and sanitation projects in Machakos County, Kenya. International Journal of Social Sciences Management and Entrepreneurship (IJSSME), 6(2).
World Bank (2022). Kenya infrastructure sector performance review. Washington, DC: World Bank.
World Bank. (2017). Supervision and Quality Management in Public Road Works: A Global Perspective with Kenya Case Study. World Bank Publications.